Mar 21,2025
Case 4: Commercial project
Dallas Smart Logistics Center (2023)
Customer pain points:
▸ A 18m column-free space is required to accommodate automated racks
▸ Energy consumption in cold storage accounts for 35% of operating costs
Solution:
✅ SmartSpan™ Long-Span System - Achieving a 21m column-free space (exceeding demand by 17%)
✅ Triple insulation enclosure - reducing cold storage energy consumption by 38%
✅ Robot welding production line - key components with an accuracy of ±0.5mm
achievements:
Warehousing efficiency has increased by 27%, resulting in annual electricity cost savings of $186,000.